[Aces-support] geo && chilled-water
aces-admin at techsquare.com
aces-admin at techsquare.com
Thu Apr 19 10:58:47 EDT 2007
hello world-
mit will be working on the chilled
water that affects e34 this weekend.
as a precautionary measure, they have
asked us to "reduce the a/c load"
in e34-500, the home of geo &al.
work on the chilled water will begin at
0200 on saturday and should be completed
by 1000 on sunday. we will shutdown
machines at 1700 friday afternoon and bring
them up sunday evening.
consequently, here is where we stand :
;; to be shutdown
. all aE34-500-1NN nodes
. 1/2 of the aE34-500-0NN nodes
;; to remain operational
. geo
. ds-02
. ds-03
. ds-04
. ds-07
. 1/2 of the aE34-500-0NN nodes
if the temperature in e34-500 begins
to climb throughout the day on saturday,
we will be forced to respond by shutting
more of the compute nodes.
sorry for the short delay, but we only
found out in the last hour.
[greg]
More information about the Aces-support
mailing list